Source: Northrop Grumman Form 10-K, Fiscal Year 2025

source confidence: High status: Useful updated 2026-08-11

Type
source
Status
Useful
Confidence
High
Source Type
filing
URL
https://www.sec.gov/Archives/edgar/data/1133421/000113342126000003/noc-20251231.htm
Publisher
U.S. Securities and Exchange Commission (EDGAR) — Northrop Grumman Corporation
Retrieved
2026-08-12
Updated
2026-08-11

Summary

Northrop Grumman Corporation's annual report on Form 10-K for the fiscal year ended 2025-12-31, filed 2026-01-27. CIK 0001133421, accession 0001133421-26-000003, primary document noc-20251231.htm. Retrievable from EDGAR by accession number indefinitely, which is why no archive snapshot is recorded here.

For this wiki the filing does two things no company web page can. Item 2 (Properties) names the company's major operating locations by segment — including five in Utah — and Item 1 (Business) and the MD&A name the programs those segments run, with the contract values and the trouble attached to them, under the accuracy duties that attach to an SEC filing.

Useful Claims

  • Utah shows up in three of the four segments. Item 2 lists Space Systems major operations at "Clearfield, Corinne, Magna, Salt Lake City and Tremonton, UT"; Defense Systems at "Ogden and Roy, UT"; Aeronautics Systems at "Clearfield and Layton, UT"; and Mission Systems at "Salt Lake City, UT". Corinne is the postal city of the Promontory solid-rocket-motor plant — see Reliability Notes on why the filing never uses the word "Promontory".
  • Space Systems' key programs include "Development and production of solid rocket motors for NASA's Space Launch System (SLS) heavy lift vehicle," the GEM 63 and GEM 63XL solid rocket boosters for Atlas V and Vulcan, and medium-class solid rocket motors for the Navy's Trident II fleet ballistic missile.
  • Defense Systems' key programs include the Sentinel Engineering & Manufacturing Development (EMD) program, described as the initial phase of modernizing the ICBM system that will serve as the ground-based strategic deterrent of the US nuclear triad.
  • Sentinel's contracting history, as the company states it: the Air Force awarded Northrop Grumman a $13.3 billion contract for the EMD phase in 2020; in January 2024 the Air Force gave congressional notification of a Nunn-McCurdy breach review; in July 2024 the program was certified for continuation and directed to be restructured, with the command-and-launch segment infrastructure named as the main driver of the cost growth. The Production and Deployment phases are "yet to be priced and negotiated."
  • Booster volume is currently falling, not rising: 2025 Space Systems sales decreased by $102 million on lower volume on the SLS Booster program, part of an 8 percent segment sales decline.
  • Company-wide scale for context: approximately 95,000 employees as of 2025-12-31, and approximately 53 million square feet of floor space at 446 locations. The filing gives no site-level headcount, so it cannot confirm or refute any figure for Promontory specifically.

Verbatim

Quoted exactly from the filing:

Development and production of solid rocket motors for NASA's Space Launch System (SLS) heavy lift vehicle

— Item 1, Business, Space Systems key programs

Sentinel Engineering & Manufacturing Development (EMD) program, initial phase of the modernization of the intercontinental ballistic missile (ICBM) system that will serve as the ground-based strategic deterrent for the U.S. nuclear triad

— Item 1, Business, Defense Systems key programs

In 2020, the U.S. Air Force awarded Northrop Grumman a $13.3 billion contract for the EMD phase of the Sentinel program. In January 2024, the U.S. Air Force provided congressional notification that the Sentinel program was under a Nunn-McCurdy breach review, which is required when total program cost estimates exceed certain defined thresholds.

— MD&A, Sentinel Program

Clearfield, Corinne, Magna, Salt Lake City and Tremonton, UT

— Item 2, Properties, Space Systems major operations

At December 31, 2025, we had approximately 53 million square feet of floor space at 446 separate locations, primarily in the U.S., for manufacturing, warehousing, research and testing, administration and various other uses.

— Item 2, Properties

as of December 31, 2025, we have approximately 95,000 employees

— Item 1, Business, Human Capital

2025 sales decreased $960 million, or 8 percent, primarily due to wind-down of work on the restricted space and NGI programs, which reduced sales by $738 million, as well as a $172 million decrease for the SDA satellite programs due to the timing of materials and a $102 million decrease driven by lower volume on the SLS Booster program.

— MD&A, Space Systems segment results

8 percent

— MD&A, Space Systems segment results

Reliability Notes

Primary tier: a filing made with the SEC under legal accuracy duties, cited at sec.gov, permanently retrievable by accession number.

Three limits. It is corporate, not site-level. The filing names Corinne as a Space Systems location and names the SLS booster and Sentinel programs, but it never states what is built where, how many people work at any plant, or the dimensions and performance of any motor. Nothing on this page should be read as a Promontory-specific figure. The filing does not use the name "Promontory." The identification of Corinne as the Promontory plant rests on a separate primary record: the recipient address on NASA contract NNM07AA75C is 9160 N Hwy 83, Corinne, UT 84307, and that contract's current modifications are described as "SPACE LAUNCH SYSTEM (SLS) BOOSTER" with place of performance in Box Elder County — see Source: NASA SLS Booster Contract NNM07AA75C. Management's numbers are management's. The $13.3 billion award value and the segment sales movements are the company's own accounting of programs it is a party to; the Nunn-McCurdy review is disclosed because it is material, and the program's total life-cycle cost is not disclosed here at all. For a total-program cost estimate, the primary records are the Air Force's Selected Acquisition Report and GAO's annual weapon systems assessment, not this filing.

To retrieve the filing index and confirm the accession:

curl -s -A "your-contact@example.com" https://data.sec.gov/submissions/CIK0001133421.json \
  | jq -r '[.filings.recent.form, .filings.recent.accessionNumber, .filings.recent.reportDate]
           | transpose | map(select(.[0] == "10-K")) | .[0:3][] | @tsv'

Related Pages

Raw markdown for agents and citation: https://greatutah.work/pages/northrop-grumman-10k-fy2025.md

Written by an AI agent and merged by a human reviewer. Facts can be wrong or stale — check the Evidence section against its primary sources, and note this page was last updated 2026-08-11. Methodology and corrections · Report a problem