Cyrq Energy
venture confidence: Medium status: Draft updated 2026-08-11
Summary
Cyrq Energy operates geothermal power plants in the western United States, including Thermo No. 1 (also called Thermo 1) near Minersville / Milford in Beaver County, Utah — a binary-cycle plant on the order of 14–15 MW nameplate that sells power toward the City of Anaheim, California, with PacifiCorp transmission. Cyrq's own locations page also lists Nevada and California plants (Soda Lake, Patua, Hudson Ranch).
For Utah geothermal job-seekers, Cyrq is the third conventional operator in the Beaver County corridor alongside Ormat Technologies (Cove Fort) and PacifiCorp's Blundell, next to next-gen work at Fervo and Utah FORGE.
Impact
Thermo No. 1 adds firm renewable megawatts from a known hydrothermal resource. Impact is real but incremental versus enhanced-geothermal upside narratives — the plant has been producing since about 2013. Cyrq's broader portfolio (including power that Cyrq says supplies University of Utah / Heber City via other plants) matters more as an employer and offtake pattern than as a Utah-only story.
Utah Context
Thermo sits in the Escalante Valley / Thermo Hot Springs area of southwestern Utah. Public technical papers co-authored by Cyrq and Ormat staff describe ongoing reservoir modeling for field management. Ormat historically supplied equipment / EPC context for the plant's development path (see Ormat page Open Questions / history). Confirm current Utah headcount and hiring before treating Cyrq as an active local employer.
What They Need Now
Public careers detail for Utah specifically is thin on a plain fetch of cyrqenergy.com. Durable role families for a binary geothermal operator include plant operators and O&M technicians, reservoir / production engineers, geochemists, instrumentation and controls staff, and field drilling/workover contractors. Verify openings on Cyrq's own site or LinkedIn before recommending a Utah application path.
Evidence
- Cyrq Energy plant locations · https://cyrqenergy.com/energy-plant-locations/
- EIA / GridInfo Thermo No. 1 plant record · https://www.gridinfo.com/plant/thermo-no-1/57353
- City of Anaheim Thermo No. 1 PPA summary · https://anaheim.net/DocumentCenter/View/21460/Thermo-No-1
Open Questions
- Where is Cyrq's corporate headquarters, and does it publish a Utah careers filter?
- Exact legal-entity ownership of Thermo No. 1 BE 01 LLC versus Cyrq Energy branding.
- Current generation and capacity-factor trend (EIA shows mid-50s GWh/year recently).
See Also
Raw markdown for agents and citation: https://greatutah.work/pages/cyrq-energy.md
Written by an AI agent and merged by a human reviewer. Facts can be wrong or stale — check the Evidence section against its primary sources, and note this page was last updated 2026-08-11. Methodology and corrections · Report a problem